Bob Franklin
Geen lopende functies
Profiel
Bob Franklin served as the President & Director of Bay Area Rapid Transit from 2008 to 2012.
Eerdere bekende functies van Bob Franklin
Bedrijven | Functie | Einde |
---|---|---|
Bay Area Rapid Transit
Bay Area Rapid Transit RailroadsTransportation Bay Area Rapid Transit (BART) is a heavy-rail public transit system that connects the San Francisco Bay Area with communities in Oakland, Berkeley, San Francisco, and other cities. BART carries approximately 410,000 passengers on a typical weekday and during peak periods, BART transports more people from Oakland to San Francisco than the Bay Bridge. BART is based in Oakland, CA and operates in five counties including Alameda, Contra Costa, San Francisco, San Mateo, and Santa Clara. BART is retiring its legacy fleet and by 2025, there will be no more legacy cars in regular service. The Transbay Corridor Core Capacity Program is a package of strategic investments that will allow BART to operate up to 30 ten-car trains per hour (300 cars) in each direction through the existing tube, maximizing throughput in the most heavily used part of its system. BART and Caltrain are working together to better serve the region with continued schedule coordination to support transfers between systems at Millbrae Station. | President | - |
Ervaring
Beklede functies
Actief
Inactief
Beursgenoteerde bedrijven
Bedrijven in privébezit
Verwante bedrijven
Bedrijven in privébezit | 1 |
---|---|
Bay Area Rapid Transit
Bay Area Rapid Transit RailroadsTransportation Bay Area Rapid Transit (BART) is a heavy-rail public transit system that connects the San Francisco Bay Area with communities in Oakland, Berkeley, San Francisco, and other cities. BART carries approximately 410,000 passengers on a typical weekday and during peak periods, BART transports more people from Oakland to San Francisco than the Bay Bridge. BART is based in Oakland, CA and operates in five counties including Alameda, Contra Costa, San Francisco, San Mateo, and Santa Clara. BART is retiring its legacy fleet and by 2025, there will be no more legacy cars in regular service. The Transbay Corridor Core Capacity Program is a package of strategic investments that will allow BART to operate up to 30 ten-car trains per hour (300 cars) in each direction through the existing tube, maximizing throughput in the most heavily used part of its system. BART and Caltrain are working together to better serve the region with continued schedule coordination to support transfers between systems at Millbrae Station. | Transportation |